Welcome, visitor! [ Register | Loginrss


1960s ARMY Field Jacket, $40. Canteen with belt, $40. Craftsman USA 240v stick welder with long leads, $195. New 20-gallon parts washer, $80. Nights, Call (336)998-8922. American Classifieds Thrifty Nickel

  • Listed: August 24, 2017 1:50 pm
  • Expires: No Date

Description

1960s ARMY Field Jacket, $40. Canteen with belt, $40. Craftsman USA 240v stick welder with long leads, $195. New 20-gallon parts washer, $80. Nights, Call (336)998-8922.

Ad Reference ID: N/A

Sponsored Links

Greensboro’s most viewed ads